Every manufacturer seeking DGMS approval must submit a complete technical file.
This file ensures that equipment is:
  • Safe
  • Tested
  • Certified
  • Traceable
  • As per standard designs
This blog explains exact DGMS documentation requirements for FLP, IS, electrical, mechanical & safety equipment β€” written in simple OME format.

πŸ”Ή 1. Why Documentation Is the Backbone of DGMS Approval? 

 Documentation ensures:

βœ” Correct design
βœ” Compliance with BIS/IEC/ATEX/IECEx
βœ” No shortcuts in manufacturing
βœ” Factory quality control
βœ” Traceability
βœ” Safe installation DGMS rejects applications with incomplete or incorrect documents.

πŸ”Ή 2. Core Components of a DGMS Technical File 

 A complete DGMS technical file includes 8 major parts:

⭐ 1) Application Forms (Form B / Form C / Form N) Used for:
  • New approval (Form B / C)
  • Provisional approval (Form N)
Must be:
  • Signed
  • Sealed
  • With all annexures

⭐ 2) Technical Drawings Drawings must include:
  • GA drawing
  • Cross-sectional views
  • Dimensional tolerances
  • Material specifications
  • Bill of materials
  • Flamepath drawings (for FLP)
  • PCB drawings (for IS devices)
  • Wiring diagrams
Drawings must be:
  • Properly numbered
  • Revision-controlled
  • Signed by design authority

⭐ 3) Test Reports (From DGMS Approved Labs) Tests required (depending upon equipment): For FLP Equipment
  • Flame transmission
  • Temperature rise
  • Internal explosion test
  • Impact/pressure test
  • Surface temperature test
For IS Equipment
  • Spark ignition tests
  • Thermal testing
  • Fault condition testing
  • ExTR (IECEx Test Report)
For Electrical Machinery
  • HV test
  • Insulation test
  • IP test
  • Load test
  • ELCB test
Reports must be:
  • Original
  • On lab letterhead
  • Signed & stamped
Acceptable labs include:
  • CIMFR
  • CPRI
  • ERTL/ETDC
  • BIS labs
  • International ExCB (for IECEx/ATEX)

⭐ 4) Quality System Certificates (QAR / QAN) QAR – Factory Quality Audit Verifies:
  • Calibration
  • Traceability
  • Testing equipment
  • Inspection records
QAN – International Quality Compliance Required for:
  • IECEx
  • ATEX

⭐ 5) BIS License & Compliance Certificates Required for:
  • FLP (IS/IEC 60079-1)
  • IS (IS/IEC 60079-11)
  • Cables (IS 1554/7098)
  • PPE (IS 2925 / 15298)
Must include:
  • Valid license copy
  • Renewal certificate
  • Annual surveillance report

⭐ 6) Factory Documents These include:
  • ISO 9001 certificate
  • Factory layout
  • Production flow chart
  • QC process
  • Calibration register
  • Material inspection records
DGMS cross-verifies these during factory audits.

⭐ 7) User Manuals & Installation Instructions Must include:
  • Operating procedure
  • Safety precautions
  • Do’s & Don’ts
  • Maintenance schedule
  • Installation steps
  • Troubleshooting

⭐ 8) Performance Reports (Field Data) Required when:
  • Renewal of approval
  • Modified design
  • Provisional approval
Reports must include:
  • Mines where equipment installed
  • Running hours
  • Failures & rectification
  • Safety events
  • User feedback

πŸ”Ή 3. DGMS Documentation Submission Workflow 

Manufacturer/IAR ↓ Document Preparation ↓ Application Submission online/offline ↓ DGMS Scrutiny ↓ Ask for clarifications (if any) ↓ Testing + Factory Audit ↓ Field Trial (if required) ↓ Final Approval (Form K)

πŸ”Ή 4. Common Reasons DGMS Rejects Applications

❌ Missing flamepath drawing
❌ Invalid BIS certificate
❌ Expired QAR/QAN
❌ Test reports older than 2 years
❌ Drawing mismatch with production model
❌ False or forged documents
❌ Incomplete annexures
❌ Wrong hazardous zone certification

πŸ”Ή 5. Checklist for DGMS Documentation (Full Compliance)
Document Mandatory
Application (Form B/C/N) βœ”
Flameproof drawings βœ”
IS circuit diagrams βœ”
ExTR (IECEx) Optional/Import
BIS license βœ”
QAR/QAN βœ”
Factory QC process βœ”
Routine test reports βœ”
User manual βœ”
Performance report Renewal only
Authorization letter (for imports) βœ”
CMR compliance declaration βœ”

πŸ”Ή 6. Documentation Required for Imported Equipment 

Overseas manufacturers must additionally provide:

  • Authorization letter
  • IECEx / ATEX certificate
  • QAR/QAN
  • Indian testing reports
  • Calibration certificates
  • Service support plan in India

πŸ”₯25 MCQs (DGMS Pattern) with Answers

1) Flamepath drawings are required for β€”

a) IS equipment
b) FLP equipment
c) PPE
d) Civil tools
e) None
Ans: b

2) DGMS approval issued in β€”

a) Form X
b) Form K
c) Form L
d) Form P
e) None
Ans: b

3) QAR stands for β€”

a) Quantity Approval Rate
b) Quality Assurance Report
c) Quick Audit Requirement
d) Quality Action Register
e) None
Ans: b

4) ExTR relates to β€” 

a) Transport
b) Explosion Test Report (IECEx)
c) Excavation report
d) Daily log
e) None
Ans: b

5) BIS license required for β€”

a) Civil items
b) FLP/IS equipment
c) Food processing
d) MMS
e) None
Ans: b

6) User manual must include β€”

a) Office staff names
b) Safety & operating instructions
c) Coal prices
d) Balance sheet
e) None
Ans: b

7) Field performance report required during β€”

a) First application
b) Festival
c) Renewal
d) Painting
e) None
Ans: c

8) Factory audit required for β€”

a) GST returns
b) QAR submission
c) Cafeteria inspection
d) Payroll
e) None
Ans: b

9) DGMS rejects application if β€”

a) Drawings signed
b) All documents complete
c) Fake certificate submitted
d) Factory passes QC
e) None
Ans: c

10) Imported items require β€”

a) Only BIS
b) Only ATEX
c) Authorization letter + IECEx/ATEX + Indian testing
d) No documents
e) None
Ans: c

11) QMS certificate for manufacturer β€”

a) ISO 45001
b) ISO 14001
c) ISO 9001
d) ISO 31000
e) None
Ans: c

12) DGMS testing labs include β€”

a) Zoo
b) CIMFR/ERTL/CPRI
c) Hotel
d) Office
e) None
Ans: b

13) Drawings must be β€”

a) Handwritten
b) Revision controlled
c) Blank
d) Verbal
e) None
Ans: b

14) Routine test reports required β€”

a) Monthly
b) With every approval submission
c) Annually
d) Optional
e) None
Ans: b

15) IAR required for β€”

a) Indian companies
b) Private mines
c) Overseas manufacturers
d) Domestic buyers
e) None
Ans: c

16) Calibration certificates are required for β€” a) Switchgear
b) Gas detectors
c) Sensors
d) All of these
Ans: d

17) SIS testing applies to β€”

a) Shoes

b) IS circuits
c) Tracks
d) Civil tools
e) None
Ans: b

18) Technical file must contain β€”

a) Song lyrics
b) All drawings and reports
c) Photos only
d) Bills
e) None
Ans: b

19) Missing flamepath dimension leads to β€” a) Warning
b) Delay
c) Rejection
d) Promotion
e) None
Ans: c

20) Authorization letter must be β€”

a) Verbal
b) On OEM letterhead
c) Sticker
d) Code
e) None
Ans: b

21) DGMS approval requires β€”

a) Colour certificate
b) Safety test reports
c) Fuel documents
d) Employee list
e) None
Ans: b

22) IS circuits must limit β€”

a) Temperature
b) Voltage
c) Current
d) All of these
Ans: d

23) Coal Mines Regulation for electricity β€”

a) Reg. 105
b) Reg. 131–138
c) Reg. 200
d) Reg. 10
e) None
Ans: b

24) Performance report submitted by β€”

a) Worker
b) Accountant
c) Manufacturer/IAR
d) DGMS clerk
e) None
Ans: c

25) Purpose of DGMS documentation β€”

a) Decoration
b) Marketing
c) Verify safety, quality & compliance
d) Reduce paperwork only
e) None
Ans: c

πŸ”š Conclusion 

Documentation is the core of DGMS approval.
A complete technical file ensures:
  • Proven safety
  • Verified design
  • Reliable performance
  • Factory quality
  • Legal compliance
Manufacturers, IARs, and mining engineers must understand these requirements to avoid rejection and ensure safe equipment in mines.

πŸš€  πŸ“˜ Download DGMS Documentation Notes at OnlineMiningExam.com
πŸ“ Practice 10,000+ DGMS MCQs
πŸ”” Join OME Telegram Channel for daily DGMS updates


{{ONLINEMININGEXAM.COM}}
India's 1st Online Mining Academy Prepare for DGMS 1st Class & 2nd Class Mining Manager......


OUR COURSES View More

/* Banner container */ #omxBanner { position: fixed; left: 50%; bottom: -120px; /* hidden initially */ transform: translateX(-50%); width: min(980px, calc(100% - 20px)); max-width: 980px; background: linear-gradient(90deg,#0f172a,#0b84ff); color: #fff; border-radius: 12px 12px 8px 8px; padding: 11px 14px; /* reduced (80%) */ box-shadow: 0 12px 30px rgba(3,10,30,0.45); display: flex; gap: 10px; align-items: center; z-index: 2000; transition: bottom 450ms cubic-bezier(.2,.9,.3,1), transform 250ms; font-family: system-ui, -apple-system, "Segoe UI", Roboto, "Helvetica Neue", Arial; } /* Show class slides banner up */ #omxBanner.show { bottom: 20px; } /* Left: icon / logo */ #omxBanner .left { flex: 0 0 51px; /* 80% of 64px */ height: 51px; border-radius: 6px; background: linear-gradient(135deg,#00d4ff,#0077ff); display:flex; align-items:center; justify-content:center; font-weight:700; color:#002; font-size:16px; /* reduced */ } /* Middle: text */ #omxBanner .center { flex: 1 1 auto; min-width: 0; } #omxBanner .center h4 { margin: 0 0 3px 0; font-size: 13px; /* reduced */ line-height: 1.1; letter-spacing: 0.2px; } #omxBanner .center p { margin: 0; font-size: 11px; /* reduced */ opacity: 0.95; } /* Right: CTA & close */ #omxBanner .right { display:flex; gap:6px; align-items:center; } #omxBanner .cta { background: linear-gradient(90deg,#ffb703,#fb8500); color: #07122a; border: none; padding: 8px 11px; /* reduced */ border-radius: 6px; font-weight: 700; cursor: pointer; text-decoration: none; font-size: 12px; /* reduced */ box-shadow: 0 6px 14px rgba(251,133,0,0.22); } #omxBanner .cta:active { transform: translateY(1px); } #omxBanner .closeBtn { background: transparent; border: none; color: rgba(255,255,255,0.9); font-size: 16px; /* reduced */ cursor: pointer; padding: 4px; line-height:1; } /* Mobile tweaks */ @media (max-width:600px) { #omxBanner { flex-direction: column; gap:6px; align-items:flex-start; padding:9px; bottom: 10px; width: calc(100% - 18px); left: 50%; transform: translateX(-50%); } #omxBanner .left { display:none; } #omxBanner .right { width:100%; justify-content: space-between; } #omxBanner .cta { width:48%; text-align:center; padding:8px 6px; font-size:11px; } }