DGMS Amendment, Suspension & Withdrawal of Approval – Rules, Grounds & Procedure | DGMS Notes


⚠️ DGMS Amendment, Suspension & Withdrawal of Approval – Complete Guide

DGMS approval is granted only when equipment meets all safety, quality & statutory requirements.
But DGMS has the authority to:
  • Amend an approval
  • Suspend an approval
  • Withdraw (cancel) an approval
if the equipment becomes unsafe, modified, or non-compliant. This blog explains exact DGMS rules, causes, corrective actions, and the procedure followed — based on DGMS Approval Policy (2016).

🔹 1. What is DGMS Amendment, Suspension & Withdrawal?
Term Meaning
Amendment Minor correction/updates to approval without cancellation
Suspension Temporary stoppage of approval due to safety issues or non-compliance
Withdrawal Permanent cancellation of approval – equipment becomes illegal

🔹 2. When Does DGMS Amend an Approval?

Amendment is required for minor modifications, such as:
  • Model number correction
  • Change in component supplier
  • Minor drawing corrections
  • Change in product name
  • BIS license number update
📌 No performance or design change is allowed without approval.

🔹 3. Grounds for DGMS Suspension 

 DGMS suspends approval when:

  ⭐ A. Safety Concerns arise
  • Sparks detected in FLP equipment
  • IS circuits fail in methane exposure
  • Electrical overheating
  • Battery leakage
  • Brake failure in BEVs
⭐ B. Poor field performance
  • Frequent breakdowns
  • Repeated component failures
  • Wrong safety alarms
  • Gas detectors giving incorrect readings
⭐ C. Complaints from Mines

DGMS receives valid complaints from:
  • Mine Manager
  • Agent
  • Owner
  • Workmen Inspector
⭐ D. Factory Audit Failures
  • QMS non-compliance
  • Fake BIS/QAR/QAN certificates
  • Production deviations
  • Poor quality control
⭐ E. Test Certificate Issues
  • Expired test report
  • Fake reports
  • Invalid calibration
⭐ F. Unauthorized Design Change 

 Most common reason. Examples:
  • Change in enclosure thickness
  • New PCB design
  • Change in flamepath dimensions
  • Use of low-quality material

🔹 4. Grounds for DGMS Withdrawal (Permanent Cancellation)

Withdrawal = complete cancellation of approval. DGMS withdraws approval when: 

⭐ A. Equipment caused an accident E.g., spark inside FLP enclosure → methane ignition. ⭐ B. Manufacturer commits fraud

  • Fake test results
  • False QAR/QAN
  • Fake BIS license
⭐ C. Intentional design modification

Major modifications without DGMS permission. ⭐ D. Extremely poor safety record Across various mines. 

  ⭐ E. Repeated non-compliance after suspension Manufacturer fails to correct issues. 

  ⭐ F. International certification revoked IECEx/ATEX cancellation triggers DGMS cancellation.

🔹 5. Procedure for DGMS Amendment Manufacturer → Submit Amendment Request (Form M) ↓ DGMS Scrutiny ↓ Updated documents submitted ↓ Approval amended Amendment is quick (10–20 days).

🔹 6. Procedure for DGMS Suspension Complaint/Inspection/Fault ↓ DGMS Issues Show-Cause Notice to Manufacturer ↓ Manufacturer Submits Explanation ↓ DGMS Evaluates Safety Data ↓ Suspension Order Issued / Conditional Approval During suspension:
  • No supply allowed
  • Mines must stop using equipment
  • Manufacturer must fix issues

🔹 7. Procedure for DGMS Withdrawal (Full Cancellation)

Suspension → Reinvestigation → Manufacturer Corrective Action ↓ Failure to Comply / Serious Safety Issue ↓ DGMS Withdrawal Order ↓ Equipment Declared Illegal ↓ Mines Must Stop Using Immediately After withdrawal:
  • Fresh approval is required
  • Full testing again
  • Factory audit again
  • No exemption allowed

🔹 8. Responsibilities of Stakeholders

⭐ Manufacturer Responsibilities
  • Report all modifications
  • Maintain QMS & calibration
  • Provide truthful documents
  • Respond to DGMS notices
  • Replace faulty equipment in mines
  • Correct design issues immediately

⭐ Mine Management Responsibilities
  • Report failure or unsafe equipment
  • Maintain user logbook
  • Stop using suspended equipment
  • Cooperate with DGMS inspection

⭐ DGMS Responsibilities
  • Enforce safety standards
  • Investigate complaints
  • Conduct factory audits
  • Order corrective actions
  • Protect miners from unsafe equipment

🔹 9. Consequences of Suspension/Withdrawal
  • Equipment becomes illegal to use
  • Mines must stop using immediately
  • Manufacturer reputational loss
  • Mandatory re-testing
  • Penalties & legal action possible
  • Importers/agents may be blacklisted

🔹 10. Examples of Scenarios Leading to Suspension/Withdrawal 

  ⚠️ Case 1: FLP Motor Producing Sparks → Immediate suspension. 

  ⚠️ Case 2: Gas Detector Showing Wrong Readings → Suspension + mandatory recalibration + retesting. 

  ⚠️ Case 3: Unauthorized PCB Design Modification → Withdrawal of approval. 

  ⚠️ Case 4: False BIS License Submitted → Permanent cancellation + legal action.


🔥 25 MCQs (DGMS Style) with Answers

1) DGMS may suspend approval if —

a) Equipment is too cheap
b) Sales increase
c) Safety issue reported
d) Mine closed
e) None
Ans: c

2) Approval amendment is done using —

a) Form K
b) Form M
c) Form L
d) Form Z
e) None
Ans: b

3) Unauthorized modification leads to —

a) Bonus
b) Decoration
c) Suspension/withdrawal
d) Promotion
e) None
Ans: c

4) Withdrawal means —

a) Temporary stop
b) Permanent cancellation
c) Repainting
d) Discount
e) None
Ans: b

5) DGMS issues ______ before suspension a) Bonus
b) Gift
c) Show-cause notice
d) Relay
e) None
Ans: c

6) FLP equipment causing spark →

a) Ignore
b) Clean
c) Immediate suspension
d) Promote
e) None
Ans: c

7) Mines must stop using equipment when — a) Colour fades
b) Approval is suspended/withdrawn
c) Rain comes
d) Manager changes
e) None
Ans: b

8) Repeated failure →

a) Renewal
b) Withdrawal
c) Training
d) None
Ans: b

9) DGMS withdrawal is —

a) Temporary
b) Permanent
c) For 1 day
d) Holiday
e) None
Ans: b

10) Amendment is for —

a) Major design change
b) Minor corrections
c) Accidents
d) Weather
e) None
Ans: b

11) Suspended equipment can be used after —

a) Festival
b) Payment
c) Reactivation by DGMS
d) Cleaning
e) None
Ans: c

12) DGMS withdrawal may be caused by — a) Good performance
b) High demand
c) Fraudulent certificates
d) New logo
e) None
Ans: c

13) Complaints may be submitted by —

a) Shopkeeper
b) Mine manager/agent
c) Driver
d) Visitor
e) None
Ans: b

14) Severe accident due to equipment →

a) Prize
b) Report only
c) Immediate suspension/withdrawal
d) Hire more workers
e) None
Ans: c

15) QMS failure during audit →

a) Renewal
b) Suspension
c) Promotion
d) Party
e) None
Ans: b

16) After withdrawal, manufacturer needs — a) Loan
b) Fresh approval
c) Paint
d) None
e) None
Ans: b

17) Fake test reports result in —

a) Appreciation
b) Discount
c) Legal action + withdrawal
d) Renewal
e) None
Ans: c

18) Battery leakage in BEV →

a) Normal
b) Safety concern
c) Decoration
d) Painting
e) None
Ans: b

19) Mines must report failures —

a) Yearly
b) Immediately
c) Never
d) Monthly
e) None
Ans: b

20) Approval becomes invalid when —

a) Manager retires
b) Withdrawn by DGMS
c) Painting done
d) Road built
e) None
Ans: b

21) Only minor change allowed in —

a) Suspension
b) Withdrawal
c) Amendment
d) Shutdown
e) None
Ans: c

22) DGMS factory audit failure →

a) Reward
b) Lunch
c) Suspend renewal
d) Replace manager
e) None
Ans: c

23) Equipment with expired approval →

a) Okay to use
b) Illegal
c) Free to use
d) Not required
e) None
Ans: b

24) DGMS ensures withdrawal to —

a) Increase profit
b) Cut cost
c) Prevent accidents
d) Paint equipment
e) None
Ans: c

25) Dirty equipment leads to —

a) Colour change
b) No withdrawal unless safety impacted
c) Automatic renewal
d) DGMS bonus
e) None
Ans: b

🔚 Conclusion

The DGMS amendment, suspension, and withdrawal provisions safeguard miners from unsafe, modified, or poorly performing equipment.
Understanding these rules ensures:
  • Compliance with DGMS
  • Safe use of equipment
  • Prevention of accidents
  • Legal protection for mines and manufacturers
Every mining professional must follow DGMS approval conditions strictly.

🚀 Download DGMS Approval & Compliance Notes at OnlineMiningExam.com
📝 Practice 10,000+ DGMS MCQs
🔔 Join our OME Telegram Channel for daily mining updates


{{ONLINEMININGEXAM.COM}}
India's 1st Online Mining Academy Prepare for DGMS 1st Class & 2nd Class Mining Manager......

OUR COURSES View More

/* Banner container */ #omxBanner { position: fixed; left: 50%; bottom: -120px; /* hidden initially */ transform: translateX(-50%); width: min(980px, calc(100% - 20px)); max-width: 980px; background: linear-gradient(90deg,#0f172a,#0b84ff); color: #fff; border-radius: 12px 12px 8px 8px; padding: 11px 14px; /* reduced (80%) */ box-shadow: 0 12px 30px rgba(3,10,30,0.45); display: flex; gap: 10px; align-items: center; z-index: 2000; transition: bottom 450ms cubic-bezier(.2,.9,.3,1), transform 250ms; font-family: system-ui, -apple-system, "Segoe UI", Roboto, "Helvetica Neue", Arial; } /* Show class slides banner up */ #omxBanner.show { bottom: 20px; } /* Left: icon / logo */ #omxBanner .left { flex: 0 0 51px; /* 80% of 64px */ height: 51px; border-radius: 6px; background: linear-gradient(135deg,#00d4ff,#0077ff); display:flex; align-items:center; justify-content:center; font-weight:700; color:#002; font-size:16px; /* reduced */ } /* Middle: text */ #omxBanner .center { flex: 1 1 auto; min-width: 0; } #omxBanner .center h4 { margin: 0 0 3px 0; font-size: 13px; /* reduced */ line-height: 1.1; letter-spacing: 0.2px; } #omxBanner .center p { margin: 0; font-size: 11px; /* reduced */ opacity: 0.95; } /* Right: CTA & close */ #omxBanner .right { display:flex; gap:6px; align-items:center; } #omxBanner .cta { background: linear-gradient(90deg,#ffb703,#fb8500); color: #07122a; border: none; padding: 8px 11px; /* reduced */ border-radius: 6px; font-weight: 700; cursor: pointer; text-decoration: none; font-size: 12px; /* reduced */ box-shadow: 0 6px 14px rgba(251,133,0,0.22); } #omxBanner .cta:active { transform: translateY(1px); } #omxBanner .closeBtn { background: transparent; border: none; color: rgba(255,255,255,0.9); font-size: 16px; /* reduced */ cursor: pointer; padding: 4px; line-height:1; } /* Mobile tweaks */ @media (max-width:600px) { #omxBanner { flex-direction: column; gap:6px; align-items:flex-start; padding:9px; bottom: 10px; width: calc(100% - 18px); left: 50%; transform: translateX(-50%); } #omxBanner .left { display:none; } #omxBanner .right { width:100%; justify-content: space-between; } #omxBanner .cta { width:48%; text-align:center; padding:8px 6px; font-size:11px; } }